Curated News
By: NewsRamp Editorial Staff
October 27, 2026

Western Star Files BLM Notice for First Eagle Point Drilling in 70 Years

TLDR

  • Western Star Resources filed a BLM notice for a 17-hole tungsten drill program at Eagle Point, positioning itself in the domestic critical minerals race.
  • The 43 CFR 3809 notice outlines 17 HQ core holes from 12 pads, 1.71 acres disturbance, and closed-loop water recirculation for minimal impact.
  • The Eagle Point tungsten project could strengthen U.S. supply security and support clean energy technologies while using concurrent reclamation to limit environmental impact.
  • This planned drill program would be the first at Eagle Point in over 70 years, testing a steeply dipping skarn contact with holes up to 820 feet deep.

Impact - Why it Matters

This news matters because tungsten is a critical mineral essential for defense, manufacturing, and high-tech industries, and the United States currently relies heavily on imports—particularly from China. Advancing a domestic tungsten project like Eagle Point could help reduce that reliance and strengthen supply chain security. The planned drill program represents the first exploration at the site in over 70 years, potentially unlocking a significant new source of tungsten. For investors, it signals progress toward resource definition, while for the broader economy, it aligns with national efforts to secure critical minerals. The small environmental footprint and concurrent reclamation also demonstrate a responsible approach to exploration, which could set a precedent for future projects.

Summary

Western Star Resources Inc. (CSE: WSR) (OTC: WSRIF) (FRA: 4K2) has taken a significant step toward revitalizing domestic tungsten exploration at its Eagle Point Tungsten Project in Hidalgo County, New Mexico. On October 22, 2026, the company submitted a 43 CFR 3809 Exploration Notice to the U.S. Bureau of Land Management (BLM) Las Cruces District Office, filed on its behalf by KC Harvey Environmental, LLC. The notice covers a planned 17-hole HQ core drill program from 12 drill pads, totaling approximately 6,000 feet, along with about 0.56 mile of temporary connector roads and one laydown area, resulting in just 1.71 acres of surface disturbance on BLM-administered and private land. According to the company, this would be the first drilling at Eagle Point in more than 70 years.

CEO and President Blake Morgan emphasized that the filing moves Eagle Point “from field mapping and exploration, to only weeks away drilling,” crediting the 2026 surface work for defining clear targets along the granite contact. The program is designed to test the steeply dipping skarn contact beneath surface exposures and talus cover. Key highlights include a small footprint with concurrent reclamation, a surface use agreement with the private surface owner, and ongoing preparations such as tendering drilling contractors and setting up logistics. The notice describes an operating period from December 2026 through December 2027, with additional state permits and financial guarantees required before drilling begins. The company is also finalizing collar locations using its Leapfrog Geo model.

Western Star Resources is a mineral exploration company with a growing strategic emphasis on tungsten and critical minerals in the United States, advancing past-producing tungsten assets in Nevada and New Mexico, plus the Western Star property in British Columbia. The scientific and technical information was reviewed by Jacob Anderson, CPG, an independent Qualified Person under National Instrument 43-101. No Mineral Resource has been established at Eagle Point. The announcement underscores the company’s push to advance a domestic tungsten project at a time when secure U.S. supply has become a national priority, as noted by Morgan.

Source Statement

This curated news summary relied on content distributed by NewMediaWire. Read the original source here, Western Star Files BLM Notice for First Eagle Point Drilling in 70 Years

Blockchain registration record for this content