Curated News
By: NewsRamp Editorial Staff
September 16, 2026
G Mining Ventures Extends Gold Mineralization at Gurupi and TZ
TLDR
- G Mining Ventures extended gold mineralization at Gurupi and Tocantinzinho, boosting resource upside for investors seeking an early-mover advantage.
- G Mining Ventures reported drill results from Gurupi and TZ, with an updated MRE due year-end and a preliminary economic assessment targeted for 2026.
- G Mining Ventures' gold discoveries in Brazil can support local jobs, community development, and a responsible supply of precious metals for global needs.
- G Mining Ventures' drills hit 79.6 metres at 1.78 g/t gold and found a new near-surface discovery at Grodiocal in Brazil.
Impact - Why it Matters
The positive exploration results from G Mining Ventures’ Gurupi and Tocantinzinho projects underscore the company’s potential to significantly expand its gold resources in Brazil. The extension of mineralization beyond current resource estimates and the discovery of new near-surface gold at Grodiocal could lead to a larger resource base, enhancing the project’s economic viability. With an updated MRE and a Preliminary Economic Assessment on the horizon, these developments may attract increased investor attention and support the company’s growth trajectory toward becoming a mid-tier precious metals producer. For investors, this news signals progress in de-risking and unlocking value from GMIN’s asset portfolio, potentially translating into improved shareholder returns.
Summary
G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) has reported promising exploration results from its wholly owned Gurupi Project in Maranhão state and the Tocantinzinho (“TZ”) mine in Pará State, Brazil. At Gurupi, drilling extended mineralization approximately 250 metres beyond the 2025 Mineral Resource Estimate (“MRE”) at Blanket, with notable intercepts including 79.6 metres at 1.78 grams per tonne gold and 63.5 metres at 1.28 g/t gold. At Mandiocal, mineralization was extended up to 125 metres below the 2025 MRE pit shell, while maiden drilling at Grodiocal confirmed a new near-surface gold discovery, highlighted by 23 metres at 1.97 g/t gold, including 9 metres at 4.24 g/t gold. An updated Gurupi MRE is expected before year-end and will form the basis of a Preliminary Economic Assessment targeted for completion by the end of 2026.
At TZ, drilling up to 150 metres below the current pit design confirmed continuity of mineralization at depth, with results including 78.1 metres at 1.81 g/t gold, including 16 metres at 4.34 g/t gold, and 51 metres at 1.31 g/t gold, including 7.8 metres at 6.42 g/t gold. Regional exploration has also defined a 15-kilometre-by-3-kilometre mineralized corridor hosting the TZ deposit and multiple satellite targets. Year to date, G Mining Ventures has completed approximately 33,600 metres of its accelerated 65,000-metre Gurupi program and 14,500 metres of its 25,000-metre TZ program.
To view the full press release, visit https://ibn.fm/L5fKQ. The latest news and updates relating to GMINF are available in the company’s newsroom at https://ibn.fm/GMINF.
This article has been disseminated on behalf of G Mining Ventures Corp. and may include paid advertising.
Source Statement
This curated news summary relied on content distributed by InvestorBrandNetwork (IBN). Read the original source here, G Mining Ventures Extends Gold Mineralization at Gurupi and TZ
