Curated News
By: NewsRamp Editorial Staff
October 13, 2026
Ares Strategic Mining Opens U.S. Fluorspar Lumps Plant in Utah
TLDR
- Ares Strategic Mining is now the sole commercial fluorspar producer in the U.S. with potential annual gross product value exceeding $25M.
- Ares Strategic Mining's new Lumps Plant processes raw fluorspar from the Lost Sheep Mine into metallurgical-grade lumps for steel and aluminum production.
- Ares Strategic Mining's fluorspar plant revives local industry, reduces U.S. reliance on imports, and supports domestic jobs and security.
- Ares Strategic Mining opened a fluorspar plant in Utah, marking the return of U.S. commercial fluorspar production after decades.
Impact - Why it Matters
This news matters because it marks a pivotal shift in U.S. critical mineral independence. For over three decades, the United States has been 100% reliant on foreign fluorspar imports, a mineral essential for steel, aluminum, and numerous high-tech applications. The reopening of domestic fluorspar production reduces supply chain vulnerabilities, supports national security, and fosters economic growth in rural Utah. With a $168.9 million Department of Defense contract and plans to produce acidspar for EV batteries and semiconductors, Ares Strategic Mining is positioning itself at the forefront of a broader effort to re-shore strategic industries. The company's collaboration with Found Industries to recover gallium and germanium—metals crucial for energy, communications, space, and defense—further underscores the potential for a new American industrial base. This development not only strengthens national security but also creates jobs, revitalizes local communities, and demonstrates how public-private partnerships can rebuild domestic supply chains for the technologies of the future.
Summary
Ares Strategic Mining Inc. (CSE: ARS) (OTCQX: ARSMF) (FRA: N811) has officially opened its Fluorspar Lumps Plant in Delta, Utah, marking the historic return of commercial fluorspar production to the United States after nearly three decades of complete reliance on foreign imports. The plant processes raw fluorspar from the company's fully permitted Lost Sheep Mine into metallurgical-grade lumps essential for steel and aluminum production, solidifying Ares as a vertically integrated critical mineral producer. The October 9, 2026 ceremony drew State and Federal congressional representatives, local stakeholders, and the entire Ares and Provo Mining teams, with U.S. Representative Mike Kennedy delivering the keynote address. "Ares was built on a simple idea: become the leading fluorspar mining company in North America and return fluorspar manufacturing to the U.S. Opening this plant is the start of that realization," said James Walker, CEO of Ares Strategic Mining. The event also honored the Spor Mountain district's eighty-year fluorspar legacy, now revived by Ares mining the mountain, trucking ore to Delta, and processing it alongside the local community.
Market demand for fluorspar remains robust, with Ares holding a $168.9m contract from the U.S. Department of Defense for future acidspar production and a signed Memorandum of Understanding with global commodities trader Cremer Erzkontor Inc. to distribute metspar across North America. At the Lumps Plant's 165,347-ton annual capacity and current metspar prices between $350 and $520 per metric ton, potential gross product value exceeds $25 million annually, signaling Ares' transition into revenue generation. The company aims to expand with a complementary Acidspar Flotation Plant, already under construction, to produce acidspar for EV batteries, semiconductors, and technology applications. Additionally, Ares is collaborating with Found Industries to recover gallium, germanium, and other strategic critical materials from Lost Sheep feedstocks. "There's a new American industrial base hiding in plain sight," said Peter Godart, President and CEO of Found Industries. "Ares is building a domestic supply chain for fluorspar and in doing so is creating an opportunity to recover other critical metals from the same resource." The company recognized engineering partners KC Harvey and Aspect Engineering, capital partner Sorbie Bornholm, and Provo Mining & Construction for their contributions to the successful commissioning of the Delta Lumps Plant, Lost Sheep Mine, and Processing Facility.
Source Statement
This curated news summary relied on content distributed by NewMediaWire. Read the original source here, Ares Strategic Mining Opens U.S. Fluorspar Lumps Plant in Utah
