Curated News
By: NewsRamp Editorial Staff
October 28, 2025
ESGold Validates Processing Strategy at Quebec Gold-Silver Project
TLDR
- ESGold's validated processing strategy at Montauban de-risks equipment procurement and supports accelerated mill construction, providing operational advantages over competitors.
- ESGold confirmed the Merrill Crowe closed circuit as optimal processing after gravity separation tests showed insufficient concentrate grades for direct pouring.
- ESGold's clean mining approach at Montauban advances sustainable resource recovery while responsibly combining production with district-scale discovery potential.
- ESGold completed advanced 3D geological modeling to guide expanded exploration at its fully permitted Quebec gold-silver project.
Impact - Why it Matters
This development represents significant progress in mining project de-risking and operational planning. For investors and industry observers, the validation of processing methods at ESGold's Montauban project demonstrates tangible advancement toward production, reducing technical uncertainties that often plague mining ventures. The confirmation of the Merrill Crowe system as the optimal processing path provides clarity on capital expenditure requirements and operational efficiency, which are critical factors in mining project economics. In the broader context of Quebec's mining sector, this progress supports the region's reputation as a stable mining jurisdiction with strong potential for resource development. For stakeholders, the ahead-of-schedule mill construction and continued infrastructure expansion signal strong project execution capabilities, potentially setting a positive precedent for future mining developments in the region while advancing responsible mining practices through the company's clean mining focus.
Summary
ESGold Corp (CSE: ESAU, OTCQB: ESAUF) has achieved a significant milestone at its fully permitted Montauban Gold-Silver Project in Quebec, with metallurgical work validating the company's processing strategy for all site feedstock. The comprehensive testing, supervised by Edmond St-Jean, P.Eng., and analyzed by ALS Global in Val-d'Or, confirmed that the Merrill Crowe closed circuit represents the optimal processing path for handling railway tailings and other materials. While gravity separation tests showed concentrate grades were insufficient for direct gold and silver pouring, the results provide crucial validation that all material will be processed through the Merrill Crowe system during the final construction phase, effectively de-risking equipment procurement and supporting ongoing mill construction that's reportedly ahead of schedule.
The company's progress extends beyond processing validation, with continued infrastructure expansion including the gold room and laboratory facilities, plus completion of advanced 3D geological modeling to guide an expanded exploration program. ESGold Corp positions itself as a fully permitted, preproduction resource company at the forefront of clean mining and exploration innovation, with its flagship Montauban property located 80 kilometers west of Quebec City serving as a model for responsible mining practices. The news was distributed through Rocks & Stocks, a specialized communications platform within the Dynamic Brand Portfolio that delivers deep insights into the mining industry through various distribution channels including InvestorWire and extensive syndication networks.
This development represents a critical step forward for ESGold as it advances toward production while maintaining its commitment to sustainable resource recovery and exploration. The validation of processing methods and continued infrastructure development at the Montauban project demonstrates tangible progress in the company's journey from exploration to production phase, combining near-term production potential with district-scale discovery opportunities in one of Canada's most promising mining jurisdictions.
Source Statement
This curated news summary relied on content disributed by InvestorBrandNetwork (IBN). Read the original source here, ESGold Validates Processing Strategy at Quebec Gold-Silver Project
