Curated News
By: NewsRamp Editorial Staff
November 13, 2026
Ares Strategic Mining Hits Saleable Fluorspar Grade, Transitions to Direct Management
TLDR
- Ares Strategic Mining now produces saleable-grade metspar lumps, positioning it to capture North American fluorspar supply ahead of first commercial shipments.
- Ares produces metspar lumps by increasing feed from Lost Sheep Mine and optimizing the Delta plant, with Bob Li leading the transition to direct management.
- Ares Strategic Mining's saleable fluorspar production supports North American industries vital to modern technology and infrastructure, strengthening domestic supply chains.
- Bob Li, a director with fluorspar expertise from the Mujim Group, now leads Ares operations on site during the transition from Provo to direct management.
Impact - Why it Matters
This news matters because it marks Ares Strategic Mining's transition from development to commercial production, a critical step for any junior miner. Successfully producing saleable-grade fluorspar validates the company's operational strategy and positions it to generate revenue. The shift to direct management under Bob Li, a fluorspar expert, signals a focus on efficiency and quality control, which could lead to more reliable output and customer satisfaction. For the North American market, a new domestic supplier of high-grade fluorspar enhances supply chain security for industries reliant on this critical mineral, including steel, aluminum, and refrigerants. Moreover, the debt settlement preserves cash and aligns Mr. Durr's interests with the company's success, strengthening the balance sheet. If Ares can consistently deliver, it could become a significant player in the fluorspar space, benefiting shareholders and supporting broader industrial needs.
Summary
Ares Strategic Mining Inc. (CSE: ARS) (OTCQX: ARSMF) (FRA: N811) has achieved a significant operational milestone: producing metallurgical-grade fluorspar (“metspar”) lumps at saleable grade that meet the customer specifications targeted for its initial deliveries. The company also announced the transition of site operations from Provo Mining and Construction, Inc. (“Provo”) to direct Ares operational management, with Director and Chairman of the Mujim Group, Mr. Bob Li, stepping in to lead the transition. Mr. Li, who brings extensive experience in fluorspar mining, processing, plant design, and metallurgy, is now on site in Delta and will continue to serve on the Board. His focus will be on consistent product quality, efficient plant operation, operator development, and close coordination between mine supply and processing.
Throughout September and October, the Delta team increased plant feed from the Lost Sheep Mine and carried out product testing and process optimisation, resulting in fluorspar lumps coming off the production line at saleable grade. Although ramp-up has taken longer than planned, the company is focused on consistently repeating product quality, increasing saleable output, and coordinating production with customer delivery requirements. First commercial shipments and sales are expected to commence in November, subject to final customer acceptance and shipping arrangements. The handover from contractor-led development to direct Ares management is expected to complete in mid-December 2026, preserving site knowledge while bringing production planning, maintenance, staffing, and operating priorities under coordinated Ares leadership. As part of the transition, Ares agreed to settle US$1,000,000 of outstanding debt owed to Provo, assigned to Roy Durr, through the issuance of 5,550,588 common shares at a deemed price of C$0.255 per share, reducing liabilities and preserving cash. Click here to see (L-R) - Mr. Lumin Ma - Geotechnical Engineer & Mr. Bob Li - Director.
CEO James Walker commented, “As Ares grows its manufacturing activities and transitions its operations, experienced operational leadership is central to converting installed infrastructure into dependable commercial output, and Bob’s knowledge of the plant and the product makes him the right person to lead operations.” Ares Strategic Mining is a junior mining company focused on developing its fluorspar projects in the U.S., aiming to become a significant supplier of high-grade fluorspar to North American markets. The Lost Sheep Fluorspar Project in Delta, Utah, is 100% owned, fully permitted, and contains extensive high-grade fluorspar with low impurities. For further information, contact James Walker at [email protected]. View the original release on www.newmediawire.com.
Source Statement
This curated news summary relied on content distributed by NewMediaWire. Read the original source here, Ares Strategic Mining Hits Saleable Fluorspar Grade, Transitions to Direct Management
