Curated News
By: NewsRamp Editorial Staff
November 03, 2025

Ares Mining Clears Final Hurdle for Full-Scale Fluorspar Production

TLDR

  • Ares Strategic Mining gains operational advantage as America's only fluorspar producer with completed ventilation system enabling full-scale mining and revenue generation.
  • Ares installed a 75-horsepower fan delivering 30,000 CFM airflow through a dedicated ventilation raise that also serves as a secondary emergency egress pathway.
  • This development supports North American industrial supply chains for critical minerals, reducing foreign dependence while creating safer mining operations for workers and communities.
  • Fluorspar from this mine powers everything from lithium-ion batteries to nuclear fuel, making it essential for modern technology and clean energy solutions.

Impact - Why it Matters

This development matters because fluorspar is designated as a critical mineral by the U.S. government, essential for manufacturing everything from aluminum and steel to lithium-ion batteries and nuclear fuel. With Ares Strategic Mining becoming the only operational fluorspar producer in the United States, this achievement reduces American dependence on foreign sources for a mineral crucial to modern technology and national security. The successful activation of the ventilation system enables industrial-scale production that could stabilize supply chains for multiple industries while creating domestic jobs and supporting the transition to clean energy technologies that rely on fluorspar-derived components.

Summary

Ares Strategic Mining Inc. has achieved a pivotal operational milestone with the successful completion and activation of its secondary underground ventilation system at the Lost Sheep Fluorspar Mine in Juab County, Utah. This critical infrastructure development, which represents the final regulatory requirement from the Mine Safety and Health Administration (MSHA), clears the path for full-scale industrial mining operations. The system features a robust 75-horsepower, 30-inch diameter fan capable of generating 30,000 cubic feet per minute of fresh airflow, custom-built by ABC Ventilation Systems and implemented by Provo Mining & Construction. The ventilation system marked with BLUE not only provides essential secondary air pathways but also serves as an emergency escape route, meeting stringent safety standards while positioning the company for continuous, large-scale production.

CEO James Walker emphasized that this achievement marks a turning point for Ares, describing it as "the final step before true production begins" that will enable the company to ramp up to full-scale mining operations and generate consistent revenue. The completion builds upon months of preparatory work including spiral decline development, ore access drifts, equipment mobilization, and surface processing infrastructure commissioning. As America's only permitted and operational fluorspar mine, Ares Strategic Mining now stands ready to begin industrial-scale ore extraction at its fully-permitted 5,982-acre Lost Sheep Fluorspar Project located in Utah's Spor Mountain area, approximately 214 kilometers southwest of Salt Lake City. The company also announced a debt settlement agreement involving the issuance of common shares to resolve $64,901.13 in outstanding obligations.

The strategic importance of this development extends beyond the company's operational readiness, as fluorspar represents a U.S.-designated critical mineral essential for numerous industrial applications. This vital mineral supports aluminum and steel production, lithium-ion batteries, fluoropolymers, hydrofluoric acid manufacturing, and nuclear fuel production. By establishing domestic production capabilities, Ares Strategic Mining aims to reduce North American dependence on foreign fluorspar sources while supporting critical industrial supply chains. The company's progress can be followed through updates available on www.newmediawire.com, where stakeholders can monitor the transition from infrastructure development to active production at what promises to be a significant contributor to America's critical mineral independence.

Source Statement

This curated news summary relied on content disributed by NewMediaWire. Read the original source here, Ares Mining Clears Final Hurdle for Full-Scale Fluorspar Production

blockchain registration record for this content.