Curated News
By: NewsRamp Editorial Staff
October 28, 2025

ESGold Validates Processing Strategy at Quebec Gold-Silver Project

TLDR

  • ESGold's validated Merrill Crowe processing system at Montauban de-risks equipment procurement and supports accelerated mill construction ahead of schedule.
  • ESGold confirmed through metallurgical testing that all feedstock will use the Merrill Crowe closed circuit system after gravity separation proved insufficient for direct pouring.
  • ESGold's clean mining approach at Montauban demonstrates responsible resource recovery while advancing sustainable mining practices in Quebec.
  • ESGold completed advanced 3D geological modeling to guide expanded exploration at its fully permitted Montauban Gold-Silver Project in Quebec.

Impact - Why it Matters

This development matters because successful metallurgical testing and validated processing strategies significantly de-risk mining projects, making them more attractive to investors and increasing the likelihood of successful production. For the mining industry in Quebec, ESGold's progress represents continued advancement in responsible resource development that could create jobs and economic activity. The confirmation of optimal processing methods reduces technical uncertainty and moves the project closer to production, potentially adding to North America's domestic gold and silver supply chains. For investors and stakeholders, these positive results demonstrate tangible progress toward revenue generation while supporting the company's positioning as an emerging player in the clean mining sector.

Summary

ESGold Corp. (CSE: ESAU) (OTCQB: ESAUF) has achieved a significant milestone at its fully permitted Montauban Gold-Silver Project in Quebec, with metallurgical work validating the company's processing strategy for all site feedstock. The testing, supervised by Edmond St-Jean, P.Eng., and analyzed by ALS Global in Val-d'Or, confirmed that the Merrill Crowe closed circuit represents the optimal processing path for both railway tailings and other materials. This validation de-risks equipment procurement and supports the ongoing mill construction, which the company reports is progressing ahead of schedule. The results from gravity separation tests showed that concentrate grades were insufficient for direct gold and silver pouring, leading to the strategic decision to process all material through the Merrill Crowe system during final construction.

The company, which operates through the Rocks & Stocks communications platform and is part of the Dynamic Brand Portfolio managed by IBN, has continued its infrastructure expansion with notable progress on the gold room and laboratory facilities. ESGold has also completed advanced 3D geological modeling that will guide an expanded exploration program at the Montauban property located 80 kilometers west of Quebec City. As a fully permitted, preproduction resource company at the forefront of clean mining and exploration innovation, ESGold positions its flagship Montauban property as a model for responsible mining practices that combines near-term production potential with district-scale discovery opportunities. The company's proven expertise in Quebec and commitment to sustainable resource recovery underscores its strategy to deliver long-term value through both production advancement and continued exploration.

Source Statement

This curated news summary relied on content disributed by InvestorBrandNetwork (IBN). Read the original source here, ESGold Validates Processing Strategy at Quebec Gold-Silver Project

blockchain registration record for this content.